Login

MENENTUKAN STANDAR JUMLAH WAREHOUSEMAN DI GUDANG SPARE PARTS ALAT BERAT MENGGUNAKAN PENDEKATAN FULL TIME EQUIVALENT (FTE)

Vol. 4 No. 02 (2025): HYPOTHESIS : Multidisciplinary Journal Of Social Sciences:

Abimanyu (1), Lifia Citra Ramadhanti (2)

(1) Universitas Tangerang Raya, Indonesia
(2) Universitas Singaperbangsa Karawang, Indonesia
Fulltext View | Download

Abstract:

This research establishes a standard for determining the optimal number of warehousemen in heavy equipment spare parts warehouses using the Full-Time Equivalent (FTE) method. PT XYZ, a leading dealer in Indonesia, operates 63 warehouses with 624 warehousemen but lacks a clear workforce standard. The study uses a quantitative, descriptive approach, analyzing operational data from a Jakarta warehouse. Activities and processing times were measured to calculate FTE based on average monthly line items and effective working hours. Results show that nine core activities require 14 warehousemen for optimal efficiency. Implementing this standard can reduce operational costs, balance workloads, and improve customer satisfaction. The findings provide practical and academic contributions to human resource management in logistics and offer a replicable model for similar industries.

References

Damayanti, M. K., Anindita, N., Ahmad, F., Stia, P., & Bandung, L. (2023). PERENCANAAN KEBUTUHAN PEGAWAI BERDASARKAN ANALISIS BEBAN KERJA MELALUI METODE FTE (FULL TIME EQUIVALENT) PADA INSTANSI X.

Maryani, R., Imran, R. A., Muhammad, K., & Wisudawati, T. (2025). WORKLOAD ANALYSIS AND DETERMINATION OF FINANCIAL SERVICE EMPLOYEE REQUIREMENTS USING THE FULL-TIME EQUIVALENT METHOD. Performa: Media Ilmiah Teknik Industri, 24(1), 23–28. https://doi.org/10.20961/performa.24.1.74501

Pratama, A. Y., Andrianti, I., & Syamtinningrum, M. D. P. (2025). ANALISIS BEBAN KERJA PEKERJA PRODUKSI MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE). Syntax Literate: Jurnal Ilmiah Indonesia, 10(8), 6296–6307.

Rismayani, R., Cahyati, D., & Hidayati, N. (2023). ANALISIS BEBAN KERJA UNTUK MENENTUKAN JUMLAH KARYAWAN PABRIK ROTI SRI REJEKI MENGGUNAKAN METODE FTE. Jurnal Teknologi, 16(1), 11–16. https://doi.org/10.34151/jurtek.v16i1.4278

Suwanto, A. A., & Mindhayani, I. (2025). ANALISIS BEBAN KERJA BAGIAN PROSES PRODUKSI DENGAN METODE FULL TIME EQUIVALENT (FTE). JISI: Jurnal Integrasi Sistem Industri, 12(1), 59–66. https://doi.org/10.24853/jisi.12.1.59-66

Wijaya, S. M., Nugraha, R. B. A., & Setiawan, E. A. (2024). FULL TIME EQUIVALENT SEBAGAI ACUAN DALAM PENENTUAN JUMLAH TENAGA KERJA. Jurnal Teknologi dan Manajemen Industri Terapan, 3(2), 125–133.

Wibisono, M. H., & Herwanto, D. (2023). ANALISIS BEBAN KERJA PADA KARYAWAN DIVISI PRODUKSI PT EMPAT PERDANA CARTON DENGAN METODE FULL TIME EQUIVALENT. Jurnal Serambi Engineering, 4923–4985.