[1]
M. Tahrir, Teguh Rizali Zahroni, Muh. Akshar, and Risna Nona, “COST PERFORMANCE ANALYSIS OF INTEGRATED LABORATORY BUILDING CONSTRUCTION BASED ON BUDGET VARIANCE ANALYSIS”, defacto, vol. 3, no. 02, pp. 123–133, Nov. 2025.