Tahrir, M. (2025) “COST PERFORMANCE ANALYSIS OF INTEGRATED LABORATORY BUILDING CONSTRUCTION BASED ON BUDGET VARIANCE ANALYSIS”, DE FACTO: Journal of international multidisciplinary sciences, 3(02), pp. 123–133. doi: 10.62668/defacto.v3i02.2399.