[1]
Tahrir, M. et al. 2025. COST PERFORMANCE ANALYSIS OF INTEGRATED LABORATORY BUILDING CONSTRUCTION BASED ON BUDGET VARIANCE ANALYSIS. DE FACTO: Journal of international multidisciplinary sciences. 3, 02 (Nov. 2025), 123–133. DOI:https://doi.org/10.62668/defacto.v3i02.2399.